Dunlop Tyre Europe GmbH (DTE), based in Offenbach am Main, Germany, said it has entered the final phase of its programme to meet the requirements of the EU Deforestation Regulation (EUDR, Regulation (EU) 2023/1115). The regulation requires deforestation-free supply chains, with particular attention on the natural rubber used in tire production, and its obligations apply to large and medium-sized companies from 30 December 2026.
DTE pointed to the simplification package published by the European Commission on 4 May 2026, which it said has further clarified the practical application of the regulation. The changes include reduced administrative effort when due-diligence information is shared along the supply chain, as well as clearer definitions of roles, responsibilities and digital verification procedures. Transparency, traceability and a robust data foundation remain at the core of the regulation, and DTE said it regards these developments as confirmation of its chosen implementation approach.
Supply chain processes in place
The company said EUDR processes have been established across the entire supply chain, from import and goods receipt through warehousing to shipment and export. Integration between SAP, the EU information system TRACES, and the logistics and barcode systems has been completed. A validation process at goods receipt has been implemented as a key control mechanism, and process, data and interface testing across the whole supply chain has already been completed successfully.
Due Diligence Statements (DDS) can now be provided and transferred transparently along the supply chain, according to DTE. The company said this enables it to demonstrate EUDR compliance both as an importer and as a downstream operator, while using information already validated by upstream supply chain partners.
The scope described covers the movement of material as well as the data attached to it, with the goods-receipt validation acting as the main control point. Natural rubber used in tire production is the focus of the regulation's requirements, and the processes DTE describes are the means by which it intends to show that the material it handles is deforestation-free.
Work planned before the go-live date
Until 30 December 2026, DTE said it will focus on further improving data quality, increasing the automation of verification processes, preparing for audits and expanding digital connectivity for customers, including through EDI-Wheel. After the go-live date, the project is to transition into regular business operations.
The 30 December 2026 date marks when the requirements begin to apply to large and medium-sized companies, and DTE expects the project work to give way to routine operations once it passes. Its stated priorities in the period before then are data quality, more automated verification, audit preparation and wider digital links for customers.