HAMS Garments Ltd. reports that it has cut CO₂ emissions by 78.1% at its existing apparel manufacturing facility in Bangladesh and has received the World Championship for Energy Savings (WCES) Certificate. The company says the recognition positions it as a leading contender for the 2026 WCES Award.
The facility covers 203,030 sq.ft. (18,861.95 m²) and has about 3,216 regular occupants. Because it is an operating garment plant, it carries continuous energy demand from production, lighting, ventilation, cooling, compressed air, pumps, motors and other building and process systems. HAMS chose to transform the existing operation rather than replace the facility, combining energy auditing, efficiency improvements, renewable energy, commissioning, metering, operational controls, preventive maintenance and staff engagement.
Efficiency and renewable energy measures
HAMS says it implemented a coordinated package of measures rather than a single intervention. Investments were identified and prioritised through ASHRAE Level 1 and Level 2 energy audits and ongoing assessment of building and production performance. The work included upgrading and optimising energy-consuming equipment, improving lighting efficiency, reducing unnecessary electrical loads, optimising motors and pumps, and improving ventilation and cooling systems. Stronger energy metering and sub-metering were added to make consumption more visible and to support corrective action.
A central investment was a 550 kW on-site solar photovoltaic system. According to the company, renewable energy now accounts for about 47.36% of the project’s energy use, reducing dependence on grid electricity and fossil-fuel-based energy. Together with efficiency measures, this contributed to an overall 75.25% energy saving.
Operational discipline and verification
The project also relies on continuous monitoring, equipment trend reviews and building-management practices to identify abnormal consumption and operational inefficiencies. HAMS implemented ongoing commissioning, preventive-maintenance planning, equipment performance monitoring and defined operational responsibilities. Energy use is periodically reviewed against expected performance so that inefficient operation can be corrected rather than left unnoticed.
A demand-response programme, including a 10% demand-reduction drill, is intended to show that the facility can actively manage electrical demand during periods of grid stress. Operating schedules and equipment use are reviewed to minimise unnecessary loads while maintaining manufacturing requirements.
HAMS also integrates staff training, operational guidelines, employee engagement and responsible energy-use practices into its management programme. Facility and maintenance personnel are trained in efficient operation, preventive maintenance, energy monitoring and corrective actions. Procedures encourage equipment to run only when needed, unnecessary loads to be switched off, and energy-intensive activities to be managed without compromising production, safety or occupant comfort.
The effectiveness of the approach has been independently demonstrated, according to the company, through LEED v4 Existing Buildings: Operations & Maintenance Platinum certification with 108 out of 110 points. HAMS presents the project as a replicable model for the apparel sector: substantial savings can come not only from capital investment but also from better operation, informed users and continuous performance management.